One workspace
Backlog, sprints, and bugs in one place.
Issues, cycles, and modules all live alongside the docs that describe them. No more tab swapping during standup.
Sprints, bug tracking, dashboards, and GitHub-native sync in one workspace. Built for engineering managers, tech leads, and developers replacing Jira, Linear, or a stack of half-glued tools.
The old way
Three patterns we hear on every call with an engineering team.
Sprints in Jira, docs in Confluence, conversations in Slack. Nobody has a single answer to "what is the team shipping this week?"
Answering "what did I ship yesterday?" means digging through six tabs, four Slack channels, and a stale Confluence page.
A bug arrives in Slack, gets copy-pasted into Jira, lands in a triage backlog, and is never seen again until a customer complains.
Onboarding means hunting through Notion, Linear, Jira, and a private GitHub doc just to find where work actually lives.
How Sprint Track solves it
Each outcome maps to a daily friction your engineers have learned to ignore.
One workspace
Issues, cycles, and modules all live alongside the docs that describe them. No more tab swapping during standup.
GitHub sync
Mention an issue in a commit or branch name and Sprint Track stitches the PR status, reviewers, and merge state to the issue automatically.
Real progress
Burndown, velocity, and at-risk issue alerts update the moment work moves. Skip the Monday-morning status meeting.
Fast onboarding
Start from a Software development template that ships with the backlog, sprint, bug tracker, and runbook structure your team needs.
Key features for software teams
Everything you need to plan, ship, and operate without context-switching.
Time-boxed work with velocity tracking and live burndown charts on every cycle.
Bug issue type with severity, steps to reproduce, and environment fields built in.
Bidirectional sync. PRs, branches, and commits link to issues with no manual work.
Board for devs, Gantt for leads, list for triage. Same data, choose your shape.
Sentry crashes and Jenkins or CircleCI failures land as triaged issues automatically.
PRDs and RFCs live next to the issues they describe. No more lost design docs.
Auto-assign bugs by label, move issues on PR merge, ping on-call on deploy.
Keyboard-first navigation, command palette, and a full REST API for everything.
What engineering teams say
We replaced Jira and Confluence with Sprint Track. Sprint ceremonies dropped from 90 minutes to 50, and our standups stopped being status updates.
The GitHub sync alone justified the switch. PR status lives on the issue card, so I can run a sprint review without opening GitHub once.
Onboarding a new engineer used to take a week of Slack threads. Now they clone the Software development template and they are productive on day one.
Integrations engineers care about
GitHub, GitLab, and Bitbucket sync issues two ways. Slack handles notifications. Sentry, CircleCI, and Jenkins turn errors and CI failures into triaged issues. Figma links design specs to the work.
Starter templates
Each template ships with the structure, fields, and views software teams actually use.
A two-week cycle template with backlog grooming, planning, and retro built in.
Bug issue type with severity, steps to reproduce, browser, and environment fields ready to fill.
Quarter-by-quarter modules with epics, sub-tasks, and a Gantt delivery view across teams.
Frequently asked questions
Yes. The two-way sync mirrors issues between GitHub and Sprint Track, so your devs can stay in GitHub if they prefer while leads work from Sprint Track.
Both. Pick the view that matches the team. Some projects can run Scrum with fixed cycles while others run pure Kanban with a flowing board. Switch per project.
Jira is a configurable monster that requires an admin to maintain. Sprint Track ships with the workflows software teams actually use, has GitHub-native sync, and includes docs and dashboards in the same workspace.
The Jira importer brings across issues, custom fields, sprints, attachments, comments, and the parent-child hierarchy. Most teams under 10,000 issues finish in under 10 minutes.
Open the Sprint planning template, pull in the backlog, and you are running a real sprint by lunch.